+971567833266 info@therepairer.ae

apply for a new connection or electricity

New Connection Requirements: Check the requirements on our website,
over the phone, or at any of our service centers.

Checking technical requirements: Checking in the field of technical requirements (internal lines, trunk, etc.).

Remember that you must have the documentary requirements on hand when requesting an examination.
Acceptance and signing of the new connection contract and payment of the electrical service:

Hand over the documentary requirements at the ENEL office of your choice, sign the contract,
and pay for the installation of the new connection according to the current tariff.
New joint installation: Works carried out as requested (without repair, with repair, with substantial repair)

Activate the electricity service.

What are the requirements for obtaining a new electrical connection?
* You must submit the original and a copy

1. ID card: a valid DNI or Alien Card.

2. Any of these documents certify that you are the owner. Submit one according to the situation:

A verbatim copy of the material issued by public records is valid for no more than one (1) year.
The property title is issued by COFOPRI.
A general bond for the sale of the purchase is granted by the notary.
Minutes of the purchase-sale contract.
Private sale contract including notarized signatures.
Certificate or proof of possession issued by the district municipality valid for a period not exceeding one (1) year.

3. About identifying your property:

A map (sketch) of the location of your property with the names of the main roads and streets around it.
Your neighbor’s supply number, i.e. the number on the left and/or right side of your property.
If you bring a photo where you can distinguish your home numbering or location and the location of the trunk (see caption),
you help us give you faster attention.
Depending on your area, you will be required to obtain a permit from
the municipality to perform electrical connection installation work.

 

What are the additional requirements for electricity?

 

If you are not an owner:
The authorization is valid and certified by a notary.
A valid national identity card or foreign card

A market or fair

The current operating license for the job or store is issued by the municipality.
Proof of non-deduction from electrical connections issued by the Board of Directors.
Electrical Distribution Plan and Load Diagram signed by an
Electrical or Electro-Mechanical Engineer with current tuition fees.

The legal person

The current authority of legal representative issued by SUNARP is valid for no more than one year.
Identity card or a valid foreigner’s card of the legal representative.

If you would like an additional counter

Internal Wiring Electrical Distribution Plan signed by an Electrical or
Electro-Mechanical Engineer with current tuition fees.

If the required power exceeds 9.9 kW

Submit a signed loading blueprint from an electrical or electro-mechanical engineer along with current tuition fees.

These works can be paralyzed if technical requirements are not met. Likewise,
the term of interest in work will be calculated after the customer has addressed the circumstances
that caused the stoppage, so you must inform it in any of our offices.

You can see the details of the documents to be submitted below:

 

What are the steps to install an electricity connection or a light meter?


The process from ordering to installing the electrical connection is as follows:

After verifying compliance with the requirements,

the budget is handed over according to the work to be performed.
Only after the electricity supply contract has been signed and the electricity service charge has been paid in accordance
with the current tariff schedule, the works (which may be without overhaul, overhaul, or substantial repair) are carried out.
Finally, we begin to install the required work, that is, to start the operation of the light connection.

 

What is the accessories table for your electricity installation?

It is these accessories that you must have installed in your home in order
for us to carry out the contracted electrical connection.

The cables for the internal electrical installation must be connected to
your electrical panel and wrapped in the trunk of the vehicle at least 1 meter long.

What is the minimum safety distance?

The National Electrical Code sets a Minimum Safety Distance – DMS,
which is the space that must exist between your home and the electrical grid.

It is an essential requirement for your meter installation. In the event of a failure,
your meter will not install until you modify the construction.

Remember:


Make a request for a new electrical connection for free. You only need to pay the installation cost.
The contracted connection is exclusively for your house or home.
The electricity connection contract is renewed annually and automatically.
If the electrical service you require is for home use, you can choose the BT5B price.
To install, move or overload your home or house, the owner and the applicant must not register the debt with us (Enel).
We recommend that a qualified electrician check the electrical installation regularly.

Documents required for a new connection include:

To allow electricity to be supplied to the structure,
two essential documents that must be submitted are proof of identification and proof of ownership/occupancy.

To prove identity, any of the following may be used:

PAN Card / AADHAR Card / Passport / Voter ID / Driving License
In the case of an organization: A certificate of Incorporation/Registration issued
by the Registrar and proof of authorization/decision of the Board of Directors to authorize the person
In case of trust: Fund registration certificate
In the case of a partnership: a registered partnership.

This page provides all the necessary information about:

New electricity meter and connection ordering procedures for AEML
Electricity clearance date
Details of all documents required for the new electricity connection
Adani electricity meter and distributor details
The offices of Adani Electricity Mumbai Limited are located nearby
Details of the security deposit to pay for electricity
Electricity fees and tariff schedule.

We offer our clients the best possible rate as per Maharashtra Electricity Regulatory Authority.
We want everyone to benefit from an uninterrupted supply of electricity.
Find out more about fees and electricity bills on the website.

 

 

error: Content is protected !!
Exit mobile version